FusionModule2000 Smart Modular Data Center
Installation Guide
4 (Optional) Installing Bases
Issue 02 (2018-03-31)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
50
Move the adjustable feet of the air conditioner base to the cabinet front (close to the front
door of the cabinet).
Move the adjustable feet of the PDC base to the cabinet rear (close to the rear door of the
cabinet).
Step 3
Secure the adjustable feet using the four M6 screws removed before.
Figure 4-15
Securing adjustable feet
----End
4.3.3 Installing Bases with Fixed Dimensions
Prerequisites
Adjustable feet of bases have been adjusted.
Preparations
Tools: marker, socket wrench, torque wrench, hammer drill, φ16 drill bit, level
Materials: base, expansion bolt, washer
Document: base installation position diagram