FusionModule2000 Smart Modular Data Center
Installation Guide
4 (Optional) Installing Bases
Issue 02 (2018-03-31)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
43
Figure 4-3
Measuring the ESD floor height
2.
Adjust the base height to H and tighten the height locking bolts on the feet.
Figure 4-4
Tightening height locking bolts
Step 2
Assemble the base.
1.
Adjust the base depth based on the cabinet depth.
2.
Tighten the bolt assembly on the telescopic rod.