FusionModule2000 Smart Modular Data Center
Installation Guide
4 (Optional) Installing Bases
Issue 02 (2018-03-31)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
44
Figure 4-5
Assembling a base
3.
Assemble the telescopic rod and the base, and then tighten the bolt assembly.
Step 3
Use a right angle to position the end cabinet base, and ensure that the outline of the upper
surface of the base aligns with the cabinet bottom outline on the floor.
Figure 4-6
Positioning the first base
Step 4
Use the end cabinet base as the reference and place other cabinet bases.
Step 5
Check that the installation position meets the requirements.
Step 6
Use a marker to mark hole positions.