4.6.4 Viewing the Service Verification Results of an MBTS
This section describes how to view the service verification results of an MBTS. After the
automatic service verification starts, the M2000 automatically collects the performance data
related to the GBTS and NodeB services and checks whether the services are normal.
Prerequisite
The automatic software commissioning already starts, and you have not confirmed the
completion of the commissioning yet.
Context
For details about the process of MBTS service verification, see
. For details about the
service verification window, see
Interface Description: Commissioning the MBTS
.
Table 4-6
Procedure of automatic service verification
Step
Description
Operation Performed
by Users
1. The M2000
collects the
performance data
related to the
GBTS and
NodeB services.
If you do not restart the MBTS
commissioning or confirm the completion
of the commissioning after the service
verification starts, the M2000 collects the
performance counter data related to the
GBTS and NodeB services according to the
shortest measurement period currently
supported by the NEs.
The performance counters of an MBTS
consist of the performance counters of the
GBTS and the performance counters of the
NodeB. For details, see
for MBTS Service Verification
Performance Counters
.
Not involved.
4 Commissioning the MBTS in GU Mode on the M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
4-20
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)