Figure 5-4
Set Steps
dialog box
4.
Set the commissioning steps and then click
OK
. The
Import
dialog box is displayed.
NOTE
If the eNodeB software and data configuration are already upgraded to the target version through the USB
storage device on site, click
Advanced
when importing the EDS file on the M2000, and then clear the
DownloadSoftware
,
DownloadData
, and
ActSoftware
check boxes in the displayed
Set Steps
dialog
box. In this case, these cleared steps are skipped in the automatic eNodeB commissioning.
5.
Click
OK
to import the EDS file. The basic configuration information about each new
eNodeB is displayed in the
eNodeB Auto Deployment
tab page.
Step 4
Check whether the imported self-configuration data and the ESN reported by the eNodeB are
automatically bound.
5 Commissioning the MBTS in GL or UL Mode on the
M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
5-12
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)