Table 7-7
Data sheet for eNodeB commissioning
Site
Name
eNodeB
Type
ESN
Commiss
ion Time
Commiss
ioning
Engineer
Commiss
ioning
Result
□
Successful
□
Failed
Commissioning Item
Conclusion
Handling Exceptions
Commiss
ioning
Preparati
on Phase
Faults in the eNodeB hardware
installation are rectified.
□
Yes;
□
No
The transmission links between
the S1 port and X2 port are
ready.
□
Yes;
□
No
Negotiation data of the eNodeB
to be commissioned is added to
the MME/S-GW.
□
Yes;
□
No
Software and data configuration
file are ready.
□
Yes;
□
No
Remote
Commiss
ioning on
the
M2000
Local
end of
the
eNod
eB
The information
regarding the eNodeB,
such as name, ID, and
ESN, is reported.
□
Yes;
□
No
The eNodeB is
powered on.
□
Yes;
□
No
Remo
te end
of the
eNod
eB
The ESN is bound.
□
Yes;
□
No
The software and data
configuration file are
loaded through the
M2000.
□
Yes;
□
No
The software is
upgraded to the target
version.
□
Yes;
□
No
7 Commissioning the MBTS by Using Local Maintenance
Terminal and M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
7-46
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)