background image

ELECTRONIC IGNITION

FUEL CONVERSION FOR MODEL 

GD19

This conversion kit shall be installed by a qualified service agency in accordance with the 

manufacturer’s instructions and all applicable codes and requirements of the authority having 

jurisdiction.  If the information in these instructions is not followed exactly, a fire, explosion 

or production of carbon monoxide may result causing property damage, personal injury or 

loss of life.  The qualified service agency is responsible for the proper installation of this kit.  

The installation is not proper and complete until the operation of the converted appliance is 

checked as specified in the owner instructions supplied with the kit.

INSTALLER: THESE INSTRUCTIONS ARE TO REMAIN WITH THE HOME OWNER.

CHECK THE BOXES TO INDICATE THAT THE CORRESPONDING STEPS HAVE BEEN COMPLETED.

Wolf Steel Ltd., 24 Napoleon Rd., Barrie, ON L4M 0G8 Canada        •  (705)721-1212         •  fax (705)720-9081       • www.napoleonfireplaces.com

WARNING:  Failure to position the parts in accordance with these 

diagrams or failure to use only parts specifically approved with 

this appliance may result in property damage or personal injury.

CAUTION:  Before proceeding with conversion the gas supply 

must be shut off prior to disconnecting the electrical power.

1.  See the instruction manual to remove the front facing, glass viewing 

door and log set.

2.  Remove the 2 securing screws indicated and remove the burner 

assembly by sliding it to the right and lifting out.

3.  Using a deep socket wrench, remove the main burner orifice. A 

back-up wrench must be used on the manifold, located below the 

housing to ensure that the aluminium tubing does not twist or kink. 

Replace the burner orifice supplied using pipe thread compound.

4. 

Loosen and remove the pilot 

tube fitting from the pilot housing.  

Replace the injector & re-assemble.
5. 

Install the replacement burner 

ensuring that the Venturi tube fits over 

the orifice.  

NOTE: Check and adjust, 

if necessary, the primary air to 

1

/

16

” 

for propane and 

1

/

32

” for natural gas.

  

Replace the screws.
6. 

To convert the main valve to 

the desired fuel, follow the instructions that are supplied with 

the regulator assembly kit.

7.  The conversion data label must be filled out and attached 

adjacent to the valve.

8.  Turn on the gas supply and check for gas leaks by brushing on 

a soap and water solution. 

Do not use open flame.

9.  Replace the log set. Then light the pilot and main burner to ensure 

that the gas lines have been purged.

10.  Replace the glass viewing door and front facing. Turn on the 

electrical supply to the fireplace.

Purge all gas lines with the glass door open. 

Assure that a continuous flow is at the burner before replacing 

the door.

                                                                                                                                                                                          

Continued on reverse 

 Kit W175-0266, Natural Gas to Propane Includes; 

REGULATOR ASSEMBLY 

1

#62 BURNER ORIFICE 

1

CONVERSION DATA LABEL 

1

PROPANE PILOT INJECTOR 

1

 Kit W175-0267, Propane to Natural Gas Includes; 

REGULATOR ASSEMBLY 

1

#52 BURNER ORIFICE 

1

CONVERSION DATA LABEL 

1

NATURAL GAS PILOT INJECTOR 

1

These kits are for use at altitudes of 0 to 4500 feet.

W415-0966 /  A / 10.27.16

PILOT TUBE 

FITTING

INJECTOR

TUBE DE LA 

VEILLEUSE

INJECTEUR

Отзывы: