Procedure
Step 1
Choose
Configuration
>
Auto Deployment
>
MBTS Auto Deployment
. The
MBTS Auto
Deployment
window is displayed.
Step 2
In
MBTS List
, select a commissioning task to be confirmed, and then click
on the toolbar
to confirm the completion of this task.
After the commissioning is complete, the M2000 stops monitoring the alarms on the GBTSs,
NodeBs, and related controllers. In addition, it stops subscribing to the service verification
performance counters of the GBTSs and NodeBs.
----End
4.8 Obtaining the MBTS Commissioning Report
A MBTS commissioning report records the task information about the commissioned MBTS
and the information about the commissioning process. When a commissioning task is still in
progress or is complete, you can obtain and analyze the commissioning report to learn the
commissioning details, to view the exceptions that occur during the commissioning, or to
determine whether to complete the commissioning.
Prerequisite
A commissioning task is in progress.
Procedure
Step 1
Choose
Configuration
>
Auto Deployment
>
MBTS Auto Deployment
. The
MBTS Auto
Deployment
window is displayed.
Step 2
(Optional) In
MBTS List
, select a commissioning task to be confirmed, and then click
on
the toolbar to export the commissioning report.
In the exported file, select
index.html
to view the detailed commissioning information.
----End
4.9 References for the MBTS Commissioning Interface
This chapter describes the interfaces and parameters for MBTS commissioning, which help you
to commission MBTSs.
4.9.1 Interface Description: MBTS Commissioning
window displayed when you commission
4.9.2 Parameters for the MBTS Deployment List
4.9.3 Parameters for MBTS Service Verification Performance Counters
3900 Series Multi-Mode Base Station
Commissioning Guide
4 Commissioning the MBTS in GU Mode on the M2000
Issue 02 (2010-07-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4-23