PS services:
Uplink GPRS Verification
and
Downlink GPRS Verification
If every performance counter related to the CS and PS services is once displayed as a value that
is not
0
, the M2000 considers the service verification a success, and the commissioning task
automatically switches to
Confirming completed
. Otherwise, the service verification persists.
NOTE
The performance data collected for service verification is saved on theM2000 for 14 days. After 14 days,
the M2000 automatically deletes the data to release system resources.
Procedure
Step 1
Choose
Configuration
>
Auto Deployment
>
GBTS Auto Deployment
to open the
GBTS
Auto Deployment
window.
Step 2
On the
GBTS List
tab page, select one or multiple commissioning tasks, and then click
.
Alternatively, right-click the tasks, and then choose
Open Service Verification Window
from
the shortcut menu.
For details about the service verification window, see
5.12.1 Interface Description: GBTS
Step 3
View the service verification results and perform corresponding operations.
The accumulation values of the counters, which are collected in the time range between the start
of the service verification and the restart of the commissioning or the confirmation of the
commissioning completion, are displayed in the service verification window.
l
If is displayed in each counter value, you can infer that the GBTS service verification
succeeds. In this case, you can check and confirm the completion of the commissioning. For
details, see
5.11.1 Confirming a GBTS Commissioning Task
.
l
If is displayed in the value of a certain counter, you can infer that the services related to
this counter are running abnormally. In this case, you need to rectify the fault. If the system
output indicates that the PS services are abnormal but no PS services exist actually, you can
confirm the completion of the commissioning.
----End
5.5.4 Restarting a GBTS Commissioning Task
This section describes how restart a GBTS commissioning task that is still in progress according
to the actual requirement. A GBTS commissioning task in progress indicates that it is not in
Waiting
or
Completed
status. If you restart a commissioning task, all commissioning operations
that are already performed are cleared, and the commissioning restarts from the OML detection.
Prerequisite
A GBTS commissioning task is created.
Procedure
Step 1
Choose
Configuration
>
Auto Deployment
>
GBTS Auto Deployment
to open the
GBTS
Auto Deployment
window.
3900 Series Multi-Mode Base Station
Commissioning Guide
5 Commissioning the MBTS in GL or UL Mode on the
M2000
Issue 02 (2010-07-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5-27