Contents
SDC / DHC
6
EN2H-0221GE51 R0812
6.8.8
System frost protection ....................................................................... 124
6.8.9
Pump forced operation ....................................................................... 127
7
Hydraulic Components .............................................................................................. 128
7.1
Heat generator: Boiler ..................................................................................... 128
7.1.1
Heat generator start-up protection ...................................................... 128
7.1.2
Heat generator minimum temperature limit......................................... 129
7.1.3
Maximum temperature limit heat generator ........................................ 130
7.1.4
Heating circuits minimum temperature limit ........................................ 130
7.1.5
Heat generator sensor control mode .................................................. 130
7.1.6
Minimum burner runtime ..................................................................... 131
7.1.7
Switching: Multi-stage heat generator/Switching differential ............... 131
7.1.8
Operation for modulating burners ....................................................... 136
7.1.9
Modulation of P part (Xp) .................................................................... 137
7.1.10
Modulation of sample time Ta ............................................................. 137
7.1.11
Modulation of integral action time Tn .................................................. 138
7.1.12
Modulation of runtime ......................................................................... 138
7.1.13
Modulation of start time ...................................................................... 138
7.1.14
Modulation of start power ................................................................... 139
7.1.15
OpenTherm ........................................................................................ 140
7.1.16
Use of boiler sensor 2 ......................................................................... 141
7.1.17
External heat generator cut-off ........................................................... 141
7.1.18
Heat generator forced discharge ........................................................ 141
7.1.19
Exhaust gas temperature monitoring .................................................. 142
7.1.20
Burner counter mode .......................................................................... 143
7.2
Heat generation, heat exchanger, district heating ........................................... 144
7.2.1
On/Off operation of the district heating valve ...................................... 145
7.2.2
Continuous heat exchanger valve control ........................................... 145
7.2.3
District heating return temperature limit .............................................. 147
7.2.4
Return temperature limit for hot-water loading .................................... 149
7.2.5
Hot-water pre-regulator with district heating systems ......................... 150
7.2.6
Mode of operation: Hot-water pre-control ........................................... 151
Содержание DHC
Страница 1: ...EN2H 0221GE51 R0812 Smile SDC heating and district heating controller SERVICE MANUAL ...
Страница 2: ...EN2H 0221GE51 R0812 ...
Страница 10: ...Contents SDC DHC 10 EN2H 0221GE51 R0812 ...
Страница 36: ...Operation SDC DHC 36 EN2H 0221GE51 R0812 Operating overview ...
Страница 66: ...Operation SDC DHC 66 EN2H 0221GE51 R0812 ...
Страница 160: ...Hydraulic Components SDC DHC 160 EN2H 0221GE51 R0812 5 4 8 Return increase menu RETURN CONTR Pg 105 See also ...
Страница 261: ......