SDC / DHC
Hydraulic Components
EN2H-0221GE51 R0812
199
If the temperature in the solar tank (hot-water tank or buffer tank)
exceeds the set value, an active forced switch-on of the solar
loading pump (see description for collector maximum temperature
limit) is interrupted. This forced switch-on is enabled again as
soon as the solar tank temperature falls more than 10 K below its
set limit.
This function defines the solar loading mode.
Solar priority mode (disabling of heat generator)
During solar loading, all demand for the heat generator is
suppressed.
Solar parallel operation
During solar loading, demand for the heat generator is permitted.
Solar priority mode - hot water (setpoint control)
During solar loading, demand for the hot-water control at the heat
generator is suppressed.
Solar priority mode - buffer (setpoint control):
During solar loading, demand for the buffer control at the heat
generator is suppressed.
Heat generator cycle disable (only with solar control mode =
priority mode)
The cycle disable serves to prevent frequent switching between
solar loading and loading by the heat generator. After a solar
loading pump switch-off, the set time has to pass before the solar
buffer tank can be loaded again by the heat generator (boiler).
Solar tank maximum
temperature limit
Solar control mode
Heat generator cycle
disable
Содержание DHC
Страница 1: ...EN2H 0221GE51 R0812 Smile SDC heating and district heating controller SERVICE MANUAL ...
Страница 2: ...EN2H 0221GE51 R0812 ...
Страница 10: ...Contents SDC DHC 10 EN2H 0221GE51 R0812 ...
Страница 36: ...Operation SDC DHC 36 EN2H 0221GE51 R0812 Operating overview ...
Страница 66: ...Operation SDC DHC 66 EN2H 0221GE51 R0812 ...
Страница 160: ...Hydraulic Components SDC DHC 160 EN2H 0221GE51 R0812 5 4 8 Return increase menu RETURN CONTR Pg 105 See also ...
Страница 261: ......