CM4 Four-Point Continuous Monitor
CM4 Technical Manual
9-6
9.2.4 Installing the Chemcassette
®
With the fresh Chemcassette
®
inside, install the carrier as follows:
1. Open the tape load lever.
2. Install the carrier onto the spool hubs. Make sure the
Chemcassette
®
tape is between the nosepiece and optics
block. Also ensure the tape is seated between the capstan
and idler roller.
3. If necessary, turn the reel hubs to engage the shafts.
4. Snap the tape guides onto the post by pressing from the top
of carrier.
CAUTION
For proper operation, make sure both reel hubs are fully engaged.
The carrier should be resting flat without any wobble.
NOTE:
If initial power up, go to
. If not, continue with Step
5.
5. Close the tape load lever. The solenoid valve automatically
turns on sample flow.
1
2
3
4
1
4
7
2
5
8
0
3
6
9
MONIT
OR
STATUS ALARM
!
LOCA
TION
PROGR
AM
RESET
ENTER
Tape load
lever (open position)
Figure 9-4: Installing the Carrier
珠海司福斯特科技有限公司
www.safedtech.com