ENGINEERING MANUAL OF AUTOMATIC CONTROL
CHILLER, BOILER, AND DISTRIBUTION SYSTEM CONTROL APPLICATIONS
363
Dual Valve Converter, Demand Limiting, Setpoint Shift
Functional Description
Fig. 95. Dual Valve Converter, Demand Limiting, Setpoint Shift Graphic.
Item No.
Function
1
Dynamic pump symbol. Pump starts on drop
in OA temperature.
2,3
Steam valves staged for hot water temperature
control.
4,5
Pump runs below OA temperature setpoint,
subject to ON-OFF-AUTO selector.
6-8
Hot water temperature setpoint varied by dual
reset schedule as OA temperature varies.
9
Controlled leaving water temperature.
10
Entering water temperature, operator
information.
11
Icon, selects the sequence of operation text
display.
Features
1. Staged 1/3 - 2/3 capacity control valves.
2. Dual reset schedule to accommodate the warm-up mode
and occupied periods.
3. Demand limiting to prevent the converter from exceeding
its required capacity when controls demand full load.
Conditions For Successful Operation
1. Technicians and users capable of understanding and
tuning the control strategy.
2. Proper settings and timings of all control parameters.
Specification
Converter Control:
Anytime the pump does not prove operation, the converter
valves shall close.
Control:
The control system shall be enabled anytime steam pressure
is available. The hot water pump shall start anytime the OA is
below 14.5
°
C, subject to a software on-off-auto command.
Control:
During early morning periods (AHUs in warm-up mode) the
hot water (HW) temperature setpoint shall vary from 68
°
C to
90.5
°
C as the OA varies from 16
°
C to –20
°
C. During occupied
periods (any AHU in occupancy mode) the HW temperature
setpoint shall vary from 54
°
C to 77
°
C as the OA varies from
16
°
C to –20
°
C. Setpoint warm-up to occupied period switching
shall be ramped such that the change occurs over a 15-minute
time duration. A PID function shall modulate the hot water
valves as required to maintain the setpoint.
Staging:
Two normally closed valves shall be provided with Kvs of
25 and 63. On a demand for heating, the small valve shall
modulate open. Upon demand for steam beyond the capacity
of the small valve for a period of five minutes, the small valve
shall close and the large valve shall assume the load. Upon a
demand for steam beyond the capacity of the large valve for a
period of five minutes, the small valve shall be re-enabled and
both valves shall operate in unison, but with a combined capacity
not to exceed the capacity noted in Demand Limiting.
16
-20
68
90.5
54
77
7
RESET SCHEDULE
OUTSIDE
AIR
WARM-UP
PERIODS
OCCUPIED
PERIODS
-26
8
77
6
SETPOINT
SEQUENCE
OF
OPERATION
11
9
77
70
10
1
5
HOT WATER
PUMP
PUMP
START POINT
OUTSIDE AIR
TEMPERATURE
14
4
H.W. SETPOINT
65
3
65
2
PERCENT
OPEN
PERCENT
OPEN
CONVERTOR C-1
AUTO
M15293
1/3 CAPACITY
2/3 CAPACITY
Содержание AUTOMATIC CONTROL SI Edition
Страница 1: ...AUTOMATIC CONTROL for ENGINEERING MANUAL of COMMERCIAL BUILDINGS SI Edition ...
Страница 4: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL iv ...
Страница 6: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL vi ...
Страница 11: ...SMOKE MANAGEMENT FUNDAMENTALS ENGINEERING MANUAL OF AUTOMATIC CONTROL 1 CONTROL SYSTEM FUNDAMENTALS ...
Страница 12: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL SMOKE MANAGEMENT FUNDAMENTALS 2 SMOKE MANAGEMENT FUNDAMENTALS ...
Страница 46: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL CONTROL FUNDAMENTALS 36 ...
Страница 66: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL PSYCHROMETRIC CHART FUNDAMENTALS 56 ...
Страница 128: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL ELECTRIC CONTROL FUNDAMENTALS 118 ...
Страница 158: ...MICROPROCESSOR BASED DDC FUNDAMENTALS 148 ENGINEERING MANUAL OF AUTOMATIC CONTROL ...
Страница 208: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL BUILDING MANAGEMENT SYSTEM FUNDAMENTALS 198 ...
Страница 209: ...SMOKE MANAGEMENT FUNDAMENTALS ENGINEERING MANUAL OF AUTOMATIC CONTROL 199 CONTROL SYSTEM APPLICATIONS ...
Страница 210: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL SMOKE MANAGEMENT FUNDAMENTALS 200 SMOKE MANAGEMENT FUNDAMENTALS ...
Страница 435: ...SMOKE MANAGEMENT FUNDAMENTALS ENGINEERING MANUAL OF AUTOMATIC CONTROL 425 ENGINEERING INFORMATION ...
Страница 436: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL SMOKE MANAGEMENT FUNDAMENTALS 426 SMOKE MANAGEMENT FUNDAMENTALS ...
Страница 493: ...INDEX ENGINEERING MANUAL OF AUTOMATIC CONTROL 483 INDEX ...
Страница 506: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL INDEX 496 NOTES ...
Страница 507: ...INDEX ENGINEERING MANUAL OF AUTOMATIC CONTROL 497 NOTES ...
Страница 508: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL INDEX 498 NOTES ...
Страница 509: ...INDEX ENGINEERING MANUAL OF AUTOMATIC CONTROL 499 NOTES ...
Страница 510: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL INDEX 500 NOTES ...
Страница 511: ...INDEX ENGINEERING MANUAL OF AUTOMATIC CONTROL 501 NOTES ...
Страница 512: ...ENGINEERING MANUAL OF AUTOMATIC CONTROL INDEX 502 NOTES ...