1. Package Inside
In parallel kit, you will find the following items in the package:
1 PCS of parallel board
1 PCS of parallel cable
3 PCS OP relay board
1 PCS of share current cable
3 PCS of 2-pin red/black cables
、
3 PCS of 4-pin brown cables and 1 PCS of14-pin grey cable
3 PCS of brown wires(each with a yellow& white core) and 1 PCS of blue wire
Long screw and short screw for assembly
CNTL board and COMMU board
(
optional
)
Note:
The specs of relay board, wire, and cable are different for 10K, 10k (L), 20K , 20K (L) 30K, 30K(L) model.
Please DO NOT mix them.
The following picture is just for reference:
2. Installation
Warning:
(For standard model)
● Make sure the UPS is not turned on before installation. The UPS should not be turned on during installation.
● Cut off all the power supply to the unit before installation.
Warning:
(For long-run model)
● Make sure a DC breaker or other protection device between UPS and external battery pack is installed. If not,
please install it carefully. Switch off the battery breaker before installation.
● Cut off all the power supply to the unit before installation.
2.1 Uncover the UPS
Uncover the UPS that intend to be paralleled by demounting all screws, and the following picture is used to
show the PCBA boards location in the UPS:
Parallel Kit Installation Guide For Galleon(pro) 3-3
V. 4.0