
Hampton
®
H27E-11DirectVentFreestandingGasStove
| 33
installation
Offset Chart
Diagram 12
7) Ensureventisverticalandsecurethebase
oftheflashingtotheroofwithroofingrails,
slidestormcollaroverthepipesectionand
sealwithamastic.
8) Installtheverticalterminationcapbytwist
lockingit.
Notes:
a)
For multistorey vertical installations,
a Ceiling Fire stop is required at the
second floor, and any subsequent floor.
Diagram 12. The opening should be
framed to 10 " x 10" inside dimensions,
in the same manner as shown in diagram
9.
b)
Any occupied areas above the first floor,
including closets and storage spaces,
through which the vertical vent passes,
must be enclosed.
Diagram 11
RoofPitchMinimumVentHeight
FeetMeters
flatto7/12
2
0.61
over7/12to8/12
2
0.61
over8/12to9/12
2
0.61
over9/12to10/12
2.5
0.76
over10/12to11/12
3.25
0.99
over11/12to12/12
4
1.22
over12/12to14/12
5
1.52
over14/12to16/12
6
1.83
over16/12to18/12
7
2.13
over18/12to20/12
7.5
2.29
over20/12to21/12
8
2.44
Diagram 8
3) ToinstalltheRoundSupportBox/WallThim-
bleinaflatceiling,cuta10inchsquarehole
intheceilingcentredontheholedrilledin
Step2.Frametheholeasshownindiagram
9.
NOTE: For best results and optimum
performance with each approved
venting system, it is highly rec-
ommended to apply “Mill-Pac”
sealant (supplied) to every in-
ner pipe connection. Failure to
do so may result in drafting or
performance issues not covered
under warranty.
4) Assemblethedesiredlengthsofblackpipe
andelbowsnecessarytoreachfromthe
appliance adapter up though the Round
SupportBox.Insurethatallpipesandelbow
connections are in the fully twist-locked
positionandsealed.
Diagram 10: The upper half of the flashing is
installed under the roofing material and not
nailed down until the chimney is installed.
This allows for small adjustments.
Note: If an offset is necessary in the
attic to avoid obstructions, it is
important to support the vent pipe
every 3 feet, to avoid excessive
stress on the elbows, and pos-
sible separation. Wall straps are
available for this purpose. See
diagram 5.
Galvanizedpipeandelbowsmaybeutilized
in the attic as well as above the roofline.
Thegalvanizedfinishisdesirableabovethe
rooflineduetoitshighercorrosionresistance.
Continuetoaddpipesectionsthroughthe
flashinguntiltheheightoftheventcapmeets
theminimumheightrequirementsspecified
indiagram11orlocalcodes.Notethatfor
steeproofpitches,theverticalheightmust
beincreased.Apoordraft,ordowndrafting
canresultfromhighwindconditionsnearbig
treesoradjoiningrooflines,inthesecases,
increasing the vent height may solve the
problem.
5) Cutaholeintheroofcentredonthesmall
drilledholeplacedintheroofinStep2.The
hole should be of sufficient size to meet
the minimum requirements for clearance
tocombustiblesof1-1/4".Sliptheflashing
undertheshingles(shinglesshouldoverlap
halftheflashing)asperdiagram10.
6) Continuetoassemblepipelengths.
Diagram 9
Содержание H27
Страница 51: ...Hampton H27E 11 Direct Vent Freestanding Gas Stove 51 notes...
Страница 56: ...56 Hampton H27E 11 Direct Vent Freestanding Gas Stove warranty...
Страница 57: ...Hampton H27E 11 Direct Vent Freestanding Gas Stove 57 notes...
Страница 58: ...58 Hampton H27E 11 Direct Vent Freestanding Gas Stove notes 58...
Страница 59: ...Hampton H27E 11 Direct Vent Freestanding Gas Stove 59...