12-9
Parts
Parts
Fluid Panel
Wall Fluid Panel, Non-intrinsically Safe
Ref.
No.
Part No.
Description
Qty.
1
243493
FLUID PANEL MODULE,
See page 12–10 for service
parts
1
2*
SOLENOID MODULE, Non-
intrinsically safe, See page
12–12 for parts
1
3
570122
AIR SUPPLY STATION,
See page 12–16 for parts
1
6
065343
CABLE, 25 pair, individually
shielded, 24 AWG
7
061134
HOSE, nylon, 200 psi (1.4
MPa, 14 bar) maximum
working pressure (not
shown)
**
8
590332
TUBING (not shown)
**
12
115846
GRIP, cable, strain relief
1
*
Keep these spare parts on hand to reduce down time.
** Order 25 ft. (7.6 m) minimum.
Order 50 ft. (15.25 m) minimum.
1
2
3
6
12
TI0169
Wall Fluid Panel, Intrinsically Safe
Ref.
No.
Part No.
Description
Qty.
1
243493
FLUID PANEL MODULE,
See page 12–10 for service
parts
1
2*
SOLENOID MODULE, IS,
See page 12–12 for parts
1
3
570122
AIR SUPPLY STATION,
See page 12–16 for parts
1
4
111985
BARRIER, IS (for barrier
slots 1, 2, and 7)
4
5
514895
BARRIER, IS (for barrier
slots 3, 4, 5, and 6)
6
6
065343
CABLE, 25 pair, individually
shielded, 24 AWG
7
061134
HOSE, nylon, 200 psi (1.4
MPa, 14 bar) maximum
working pressure (not
shown)
**
8
590332
TUBING (not shown)
**
9
195012
LABEL, warning, IS (not
shown)
5
10
065145
WIRE, copper (not shown)
**
12
115846
GRIP, cable, strain relief
1
13*
115429
FUSE, barrier (for items 127
and 128, see page 12–4)
2
*
Keep these spare parts on hand to reduce down time.
** Order 25 ft. (7.6 m) minimum.
Order 50 ft. (15.25 m) minimum.
Replacement labels, tags and cards are available at no
cost.
TI0169
1
2
3
6
12
4
5
1
2
For barrier slots 1, 2, and 7.
For barrier slots 3, 4, 5, and 6.
1
2
TI0167
Содержание PrecisionMix ii
Страница 6: ...6 ...
Страница 7: ...1 1 Warnings Warnings 1 ...
Страница 8: ...1 2 Warnings ...
Страница 11: ...Overview 2 1 Overview 2 ...
Страница 12: ...2 2 Overview ...
Страница 15: ...Overview 2 5 ...
Страница 31: ...Installation 3 1 Installation 3 ...
Страница 32: ...Installation 3 2 ...
Страница 58: ...Installation 3 28 Notes ...
Страница 63: ...Installation 3 33 Power up Checklist Fig 3 23 CP Interface Step 5 Step 6 Step 4 Step 7 Step 10 ...
Страница 67: ...Operation 4 1 Operation 4 ...
Страница 68: ...Operation 4 2 ...
Страница 83: ...Operation 4 17 Notes ...
Страница 90: ...Operation 4 24 ...
Страница 91: ...Screen Map 5 1 Screen Map 5 ...
Страница 92: ...5 2 Screen Map ...
Страница 94: ...5 4 Screen Map ...
Страница 95: ...Run Monitor 6 1 Run Monitor 6 ...
Страница 96: ...Run Monitor 6 2 ...
Страница 103: ...Totalizers 7 1 Totalizers 7 ...
Страница 104: ...Totalizers 7 2 ...
Страница 108: ...Totalizers 7 6 ...
Страница 109: ...System Configuration 8 1 System Configuration 8 ...
Страница 110: ...System Configuration 8 2 ...
Страница 138: ...System Configuration 8 30 PrecisionMix II 3K Robotic Interface Integrated Color Change TI0494 Fig 8 1 ...
Страница 142: ...System Configuration 8 34 ...
Страница 143: ...Recipe Setup 9 1 Recipe Setup 9 ...
Страница 144: ...Recipe Setup 9 2 ...
Страница 165: ...10 1 Troubleshooting Troubleshooting 10 ...
Страница 166: ...10 2 Troubleshooting ...
Страница 182: ...10 18 Troubleshooting ...
Страница 183: ...11 1 Service Service 11 ...
Страница 184: ...11 2 Service ...
Страница 192: ...11 10 Service ...
Страница 193: ...12 1 Parts Parts 12 ...
Страница 194: ...12 2 Parts ...
Страница 207: ...12 15 Parts Notes ...
Страница 228: ...12 36 Parts ...
Страница 229: ...13 1 Utilities Software Utilities Software 13 ...
Страница 230: ...13 2 Utilities Software ...
Страница 254: ...13 26 Utilities Software ...
Страница 255: ...14 1 Technical Data Technical Data 14 ...
Страница 256: ...14 2 Technical Data ...
Страница 259: ...14 5 Technical Data Notes ...