Gossen Metrawatt GmbH
3
Measuring Protective Conductor Resistance – RPE ..... 46
Insulation Resistance Measurement – RINS ................. 50
Measuring Leakage Current......................................... 53
15.8.1 Protective Conductor Current – IPE ............................. 54
15.8.2 Touch Current – IT....................................................... 58
15.8.3 Device Leakage Current – IE........................................ 61
15.8.4 Leakage Current from the Applied Part – IA ................. 64
15.8.5 Patient Leakage Current – IP ....................................... 66
15.9
Probe Voltage – U ....................................................... 68
Function Test – P......................................................... 71
Testing Extension Cords for Correct Function – EL1 .... 72
Special Functions – EXTRA..............................74
Test Sequences (automatic test sequences) ..76
General Settings
(Setup: Auto Measurements parameter)....................... 77
Configuring Test Sequences........................................ 79
17.2.1 Test Sequence Menu: View and Icons ......................... 79
17.2.2 Selecting and Configuring the Integrated Test
Sequence at the Test Instrument ................................. 81
17.2.3 User-Defined Test Sequences
Connecting the DUT .................................................... 89
Selecting a Test Object................................................ 89
Checking Connection and Starting the Test Sequence 90
Executing and Evaluating Test Steps ........................... 90
End of the Test Sequence ........................................... 91
Saving Test Results ..................................................... 92
Reports..............................................................94
Print Settings ............................................................... 94
Saving Reports to a USB Flash Drive HTML)................ 94
Sending Reports to the Printer..................................... 94
Transferring and Saving Test Structures and
Measurement Data (test instrument data base)..95
Export – Transferring Test Structures and Measurement
Data from the Test Instrument to the PC (IZYTRONIQ) ..... 95
database extension – Z853R or feature KB01)............. 95
Import – Loading Test Structures Created in the Software
(IZYTRONIQ) to the Test Instrument (only with SECUTEST
DB+ database extension – Z853R or feature KB01)....... 95
Backup and Restore via USB Flash Drive .................... 96
Maintenance .....................................................97
Technical Safety Inspections........................................ 97
Housing Maintenance .................................................. 97
Test Instrument Self-Tests ........................................... 97
Backup Battery for Real-Time Clock ............................ 97
Fuse Replacement.................................................................... 97
Calibration ................................................................... 97
20.6.1 Required Recalibration Interval..................................... 97
20.6.2 Setting Calibration and Recalibration Dates ................. 98
20.7
Software/Firmware Update (system info parameter)..... 98
Types.......................................................................... 99
List of Error Messages .............................................. 100
Contact, Support and Service ........................109
Returns and Environmentally Sound Disposal . 109
CE Declaration ................................................110
Содержание SECULIFE ST BASE 25
Страница 111: ...Gossen Metrawatt GmbH 111 ...