![Global Contract Bridges II Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/global-contract/bridges-ii/bridges-ii_installation-manual_2232713042.webp)
Page
•
globalcontract.com
41
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Table Mounted End Shelf
Note: the Table end shelf can only be installed on rectangular legs.
Remove vertical cable manager cover from both legs.
Installation of this product requires that this product is placed on assemble leg frame
prior to installing worksurfaces.
STEP 1: Secure hanging brackets to the Table End Shelf (24” and 30” Table end shelves
come with two, while 50.5” and 62.5” Table End Shelves come with four hanging
brackets).
Slide the brackets through back wall of the Table end shelf.
STEP 2: Push the tubular part of the bracket up against the underside of the top and
secure the bracket with two supplied nuts.
STEP 3: Align holes in the top part of the bracket with pilot holes and secure with
supplied wood screws.
STEP 4: Hang the Table end shelf onto the leg horizontal beam, ensure that all
brackets are securely seated and the End shelf centered on the leg frame.
1
2
3
4
NOT UL LISTED