![Global Contract Bridges II Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/global-contract/bridges-ii/bridges-ii_installation-manual_2232713038.webp)
Page
•
globalcontract.com
37
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Accessory Rail Installation Single Sided
Table mounted accessory rail kits vary in length and in types of supporting verti-
cal uprights:
Identify the required rail length and specifi ed support type.
DOUBLE SIDED RAIL FOR BACK-2-BACK TABLE APPLICATIONS:
STEP 1: Slide both upright brackets into corresponding grooves in the back of
both rail assemblies.
STEP 2: Adjust position of both rails.
STEP 3: Raise the entire assembly through the gap between the work surfaces.
STEP 4: Align the bottom brackets with pilot holes in the bottom of each work
surface and secure with supplied wood screws.
STEP 5: Ensure that both rails are centred or adjust as needed. Loosen screws se-
curing the uprights to the work surfaces should you encounter diffi culties sliding
the rails sideways and retighten.
STEP 6: Ensure that all transparent injection moulded caps are in place.
5
3
4
2
1
6