![Global Contract Bridges II Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/global-contract/bridges-ii/bridges-ii_installation-manual_2232713024.webp)
Page
•
globalcontract.com
23
• Summer 2017
GLOBAL
Contract
4
INSTALLATION GUIDELINES
Note: Side 2 Side laminate divider can be installed in the middle of a work surface and
over two adjacent work surfaces supported by round legs. Because rectangular legs
occupy bottom corners of work surfaces it cannot be installed over two adjacent work
surfaces unless they are supported by 34” deep Back 2 Back leg.
Installation guidelines are the same for both fl ush & extended Side 2 side Dividers. The
bend direction on the front bracket and hole location on laminate are the only differ-
ences.
STEP 1: Align the front bracket with pilot holes at the bottom of Side 2 Side laminate
divider and secure with supplied screws.
STEP 2: Align the rear bracket with pilot holes at the rear edge of Side 2 Side laminate
divider and secure with supplied screws.
STEP 3: Slide the divider over the front edge of a work surface at the desired location.
STEP 4: Attach connector 2 brackets with supplied acorn cap nut. once tight, adjust
divider’s position and secure it to work surface with supplied screws as illustrated.
1
4
Side 2 Side Laminate Divider
2
3
NOT UL LISTED