INSTALLATION GUIDELINES
B
A
Elevated Shelves: Parallel / Perpendicular
Parallel elevated shelf
A
fi ts over gap between two Back 2 Back tables. Grommets in its
gables accommodate cable passage and Above work surface power trough.
Establish fi nal location of Perpendicular elevated shelf
B
in accordance with your plans.
Position it in place and peel off protective layer from adhesive tape at the bottom of the
perpendicular elevated shelf gables.
Apply pressure to ensure that both shelf gables adhered to the table’s work surfaces.
Shared Credenza and Shared Storage Divider Placement
Shared credenza has been designed to be placed partially under the table. Work surface
edge should be aligned with the edge of the open
A
compartment as illustrated.
Similarly, Shared storage divider’s central partition edge
B
should be aligned with the
work surface as well.
B
A
NOT UL LISTED