![Global Contract Bridges II Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/global-contract/bridges-ii/bridges-ii_installation-manual_2232713020.webp)
Page
•
globalcontract.com
19
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
34” Leg Shroud
3
5
4
6
2
1
STEP 1: Complete installation of tables, worksurfaces, power troughs, power outlets and
data/communication cables.
STEP 2: Remove Vertical cable manager from both legs. Engage tabs at either bottom
end of the shroud with the groove in the legs (the same groove Vertical Cable Managers
snap into).
STEP 3: Rotate the shroud up, into vertical position while making sure that the bottom
tabs remain engaged in the leg groove.
STEP 4: Secure the shroud to work surfaces with supplied screws (6 screws per
shroud).
STEP 5: Follow the same procedure to install the second shroud on the opposite side of
the leg.
STEP 6: Scoop up the data/communication cables into the cable manager and snap
the manager into the power trough while making sure that the groove in the extruded
manager is engaged with all inwardly pointing trough tabs.
NOT UL LISTED