![Global Contract Bridges II Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/global-contract/bridges-ii/bridges-ii_installation-manual_2232713012.webp)
Page
•
globalcontract.com
11
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Electrical System
An 8-wire, 4-circuits, 3+1 electrical systems complies with UL 1286
8
Wires
4
Circuits
Receptacles Specifi cations
4 Lines (12ga.)
3 Utility Circuit
Duplex - Up to 12 duplex receptacles per circuit
120 VAC system rated at 20A (15 CSA)
2 Neutrals
1 Isolated Circuit
2 Grounds (12ga.)
LINE - 4 PINK
LINE - 1 BLACK
NEUTRAL - 1 WHITE/BLACK
GROUND - 1 GREEN
GROUND - 2 GREEN YELLOW
NEUTRAL - 2 WHITE/RED
LINE - 2 RED
LINE - 3 BLUE
12 GAUGE
12 GAUGE
10 GAUGE
12 GAUGE
12 GAUGE
10 GAUGE
12 GAUGE
12 GAUGE
#2
#1
#4
I.G.
#3
Cable Basket
2
1
Cable Basket
8” wide basket manages cable excess under single and Back 2 Back work
surfaces, as well as under storage cabinets. It is suspended on four spring steel
brackets so it can be easily unclipped to rearrange cable connections from below
the work surface or below storage units.
Wire baskets are available in incremental sizes, usually about 8” shorter than the
intended work surface / storage span.
STEP 1) Identify the correct basket length. Attach supplied spring brackets on
the basket as illustrated so that the hooks point inward. Center the basket below
work surface.
STEP 2) Secure by driving supplied screws through the four brackets into the
work surface.
Storage cabinet installation:
bottoms of storage cabinets are provided with
pre-drilled holes. Attach supplied spring brackets on the basket so that the hooks
point inward. Secure the baskets by driving supplied screws through the four
brackets into the storage cabinet’s bottom.
Long Wire Baskets can span under several storage cabinets. As a general rule,
specify Cable Basket min. 8” shorter then the storage cabinet spine assembly.
NOTE:
Install dividers, storage and table top accessories prior to proceeding with the
installation of below surface power trough.
A) SUPPORTING STRUCTURE
Identify length and location of required Power Troughs and position them in ac-
cordance with lay-out plans. Install brackets on Power Troughs. Make sure that all
Power Troughs are securely connected before proceeding with installation of electrical
components.
B) ELECTRIC COMPONENTS
Identify type and location of required electrical components and position them in
accordance with lay-out plans. Secure Power Feed to the Power Trough brackets
(ensure that the liquid tight whip is long enough to reach the power source / fl oor
monument. Proceed with connecting Power Distribution Assemblies and Jumper
Harnesses on the ground, just below their future location. Install Duplex Receptacles
as specifi ed. Secure interconnected electrical components to Power Trough.
C) DATA/COMMUNICATION
Arrange cables below their future location into bundles under the tables. Install cable
terminals and snap Terminal Plates into the openings in the middle of Power Trough.
Proceed from one side of the table assembly, lift cable bundles and secure them to
the Power Trough with extruded Data Cable Manager.
D) CONNECT TO THE BUILDING POWER SUPPLY
It is recommended that the connection to the building power supply be made under
the supervision of a licensed electrician and according to applicable codes and regula-
tions. Connection to the building power supply must be done by a licensed electrician.
Do not connect or disconnect components while the system is under load. Discon-
nect the main power before servicing or reconfi guration.
E) WALK THROUGH / INSTALLATION INSPECTION
Below Worksurface Power Trough