![Global Contract Bridges II Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/global-contract/bridges-ii/bridges-ii_installation-manual_2232713015.webp)
•Page
globalcontract.com
14
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
STEP 7: Secure interconnected Electrical Components to Power Troughs: Pro-
ceed from the Power Feed by connecting its harness to the Power Distribution
Housing.
NOTE: There is an arrow and a letter “N” on each Power Distribution Housing
and every Power Feed referring to the correct position in relation to each other.
STEP 8: Insert assembled Electrical Components into the Power Trough from
the bottom. Ensure that all four Duplex Receptacles are located in their desig-
nated openings.
STEP 9: Insert Duplex Retainer into the gap between Power Trough and the bot-
tom of the Duplex Receptacle.
STEP 10: Center the Duplex Retainer, locate duplex retainer tabs between cutout
edges.
STEP 11: Reach around power trough and push down on tab to lock. You will
hear it click into place. Teeth on the retainer grab the edge of metal to hold in
place.
NOTE: There must be only one power feed entry into each cluster of harnesses.
WARNING! It is recommended that installation of the wiring system be made un-
der the supervision of a licensed electrician in accordance with applicable codes
and regulations. Connection to the building power supply must be done by a
licensed electrician. Do not connect or disconnect components while the system
is under load. Disconnect the main power before servicing or reconfi guration.
7
8
11
9
10