
98
PLC with autoSamPLer ConfiGuration
|
PLC PurifiCation SyStemS
p
LC
W
iT
H
A
U
TO
SA
M
p
Le
R
C
O
n
F
iG
U
R
A
Ti
O
n
Transfer Tubing Connection
the transfer tubing is routed from the syringe pump to the outlet of the automatic loop
injection valve of the PLC Purification System. refer to
Plumbing Connections on page 96
the transfer tubing is ordered separately, according to the syringe size. refer to the table
below for part numbers.
Transfer Tubing
Part number
Syringe Size
Description
499671112
5 mL
Transfer tubing 5.5 mL
499474103
10 mL
Transfer tubing 10.5 mL
499483602
25 mL
Transfer tubing 30 mL
to install the transfer tubing:
1. Connect one end with 1/4”-28 fitting to the transfer tubing side of the valve of the
Verity 4020 Syringe Pump (right-hand port), and finger-tighten the nut.
2. Connect the other end to the outlet of the shut-off valve, connected to the waste outlet
(port 2) of the automatic loop injection valve of the PLC Purification System and finger-
tighten the nut.
Rear Panel Connections
Diagram
the following diagram provides a general overview of the connections described in this
section.
Figure 73
Electrical Diagram for the PLC Purification System with GX-241 Liquid Handler and VERITY® 4020 Single Syringe Pump
+
5
6
7
8
9
0
1 2 3 4
5 6
7
8
9
0
1
2
3
4
A
B
C
d
e
F
G
VeRiTY® 4020
Single Syringe
pump
Gx-241
Liquid Handler
pLC purification System
Right Side
Left Side
OR
Содержание PLC 2050
Страница 1: ...PLC 2050 2250 2500 Purification Systems User s Guide...
Страница 6: ...PLC 2050 2250 2500 Purification Systems USER S GUIDE...
Страница 34: ......
Страница 50: ......
Страница 58: ......
Страница 70: ......
Страница 78: ......
Страница 88: ......
Страница 102: ......
Страница 112: ......
Страница 130: ......
Страница 131: ......
Страница 132: ...www gilson com ContactUs LT380160 01...