
100
PLC with autoSamPLer ConfiGuration
|
PLC PurifiCation SyStemS
p
LC
W
iT
H
A
U
TO
SA
M
p
Le
R
C
O
n
F
iG
U
R
A
Ti
O
n
VERITY® 4020 Single Syringe Pump
the Verity® 4020 Single Syringe Pump communicates with GGP Software via uSB.
to make the uSB connection between the syringe pump and the PLC Purification System,
use the uSB cable supplied in the accessory kit. use the end with the a-type (flat) connector
to connect to a uSB port of the PLC system, and use the end with the B-type (square)
connector to connect to the syringe pump.
Power Connections
use the power cord on the external power supply to make the connection between the power
receptacle on the GX-241 Liquid handler and the external power supply.
the connection from the external power supply to the GX-241 Liquid handler uses a
connector with a locking collar. Check the alignment of the pins and then push in until it clicks
and locks in place. to disconnect, pull back on the locking collar and then disconnect the
cable from the rear panel of the GX-241 Liquid handler.
Locate the appropriate power cord for the line voltage and then make the connection
between the external power supply and the aC power source.
repeat the previous operation for the power connection of the Verity 4020 Syringe Pump
and its external power supply.
Start Up
follow all prior instructions to make all rear panel and plumbing connections.
to start the GX-241 Liquid handler and the Verity 4020 Syringe Pump:
1. Power on the external supply, and then power on the GX-241 Liquid handler, using the
power switch on the rear panel.
●
the green power indicator light on the front panel illuminates.
●
the two-digit front panel display indicates 0 (no error).
2. Power on the Verity 4020 Syringe Pump, using the power switch on the side panel.
●
the green power indicator light on the front panel illuminates.
●
the syringe pump initializes. it stops with the valve set to the outlet (transfer tubing)
position.
3. Power on the PLC Purification System and wait for GGP Software to start.
Содержание PLC 2050
Страница 1: ...PLC 2050 2250 2500 Purification Systems User s Guide...
Страница 6: ...PLC 2050 2250 2500 Purification Systems USER S GUIDE...
Страница 34: ......
Страница 50: ......
Страница 58: ......
Страница 70: ......
Страница 78: ......
Страница 88: ......
Страница 102: ......
Страница 112: ......
Страница 130: ......
Страница 131: ......
Страница 132: ...www gilson com ContactUs LT380160 01...