
53
PLC 2050/2250/2500 PurifiCation SyStemS
| uSer’S GuiDe
p
r
Im
e t
h
e
p
U
m
p
Prime the Pump
When tubing is empty and the pump is unprimed,
it may be difficult to pump new solvent into the
system. to ease this process:
1. Launch the
purge mode
in GGP Software.
(refer to the
Gilson Glider Prep Software (GGP)
User’s Guide
.)
2. Loosen the knurled knob (one-half turn
counter-clockwise) of the purge valve located
above the pump heads.
3. once solvent has flowed through the purge outlet
tubing, stop the pump and tighten the knurled
knob (clockwise) to close the purge valve.
Figure 49
Close Purge Valve Message
Figure 50
Purge Valve Knurled Knob
Purge Valve outlet
Knurled
Knob
Содержание PLC 2050
Страница 1: ...PLC 2050 2250 2500 Purification Systems User s Guide...
Страница 6: ...PLC 2050 2250 2500 Purification Systems USER S GUIDE...
Страница 34: ......
Страница 50: ......
Страница 58: ......
Страница 70: ......
Страница 78: ......
Страница 88: ......
Страница 102: ......
Страница 112: ......
Страница 130: ......
Страница 131: ......
Страница 132: ...www gilson com ContactUs LT380160 01...