![GE Moisture Image 1 Series Скачать руководство пользователя страница 87](http://html.mh-extra.com/html/ge/moisture-image-1-series/moisture-image-1-series_programming-manual_128402087.webp)
Advanced Programming
3-23
April 2004
Selecting the Function,
Baud Rate and Node ID
or Matrix Interval
Figure 3-19 on page 3-32 for a menu map.
1. From the Port Settings Menu (see Table 3-8 on page 3-22), press
the FUNCTION menu key to scroll through the available port
functions (for example, a printer or PanaLink software), and stop
at the desired function.
Note:
The third menu key alternates between NODE ID for the
PanaLink function and INTERVAL for the printer function.
2. Press the BAUD menu key.
3. Move the brackets to the desired baud rate and press [YES].
We recommend that you do not set the baud rate below 2400. At
lower speeds, several seconds are required to transmit data.
Note:
If you are using GE Panametrics PanaLink software, set the
baud rate to 19,200.
4. The next step will depend upon the function selected in Step 1.
a. If you selected PanaLink as the function, press the NODE ID
menu key. Unless you are instructed to change the ID number
by GE Panametrics, please leave the number at the default ID
of 16. Press [YES] to confirm the entry.
b. If you selected a printer as the function, press the INTERVAL
menu key and enter, in minutes and seconds, the interval at
which you wish the meter to transmit matrix report data. Press
[YES] to confirm the entry.
5. Press the DONE menu key to return to the Output Settings Menu.
You have completed setting up the communications port. If you
selected the printer function, the meter will begin transmitting data at
the selected interval. Refer to the following section for a description
of a sample output.
Содержание Moisture Image 1 Series
Страница 2: ...Moisture Image Series 1 Hygrometer Programming Manual ...
Страница 7: ...Chapter 1 ...
Страница 18: ...Chapter 2 ...
Страница 61: ......
Страница 62: ...Your passcode is 2719 Please remove this page and put it in a safe place for future reference ...
Страница 63: ...Chapter 3 ...
Страница 97: ...Chapter 4 ...
Страница 101: ...Programming with PanaView 4 3 April 2004 Open the Meter Display Window cont Figure 4 1 The Meter Display Window ...
Страница 103: ...Programming with PanaView 4 5 April 2004 Change Meter Programming cont Figure 4 2 Matrix Display After Programming ...