Critical Power
Modifications reserved
Page 41/69
GE_UPS_ISG_TLE_SUL_M62_1M0_2US_V010.docx
Installation Guide
TLE Series 625 - 750 - 1000 UL S2
TLE Series 1000 Access to the bus bars for the cable connections
Fig. 4.9-2 TLE Series 1000 - Access to connection bus bars
To access
Input, Output
and
Battery
connections
proceed as follows:
•
Remove the front protection panels
“
A
,
B, C
”
.
•
Top entry cables: remove the plates
“
D
&
E
”
.
•
Bottom entry cables: remove the plates
“
F
&
G
”
.
NOTE !
For UPS correct
operation, the input
utility phase rotation
must be clock-wise.
CAUTION !
Panel “A, B, C, D, E, F and G” should never be removed or replaced with power
applied to the UPS.
These panels are in close proximity to 480V live buss bars.
Always disconnect the rectifier, bypass, load and battery sources from the UPS
before removing or replacing these panels.
If not serious injury or death could occur!
D
!
Please remove
the plates (D-E-F-G) before
drilling any wholes
TLES_UL_10
00_S2_UPS
connection_
01US
-
+
1
2
E
Top entry cables
Battery
Top entry cables
Utility input & Load output
Bottom entry cables
Battery
Bottom entry cables
Utility input & Load output
F
G
A
B
C
Содержание FGC TLE Series
Страница 1: ...TLE SERIES UPS 40 150 KVA KW 480 VAC Three phase Highly Efficient and Scalable GE Industrial Solutions...
Страница 14: ...14 LP33 Series II UPS www gecriticalpower com Notes...
Страница 15: ...15 LP33 Series II UPS www gecriticalpower com Notes...
Страница 333: ...TLE Series UPS 225 1500 kW for best in class multi mode operating efficiency...