TLE Series 160 - 500 UL S2B
Installation notices in case of power connection with
Dual Input Utility
Fig. 4.8.2-3 TLE Series 300 - 400 - 500 Interconnection links BR1, BR2 and BR3
NOTE !
For separate
Bypass
and
Rectifier
input configuration, the interconnection links
BR1
,
BR2
and
BR3
MUST BE REMOVED (see
Fig. 4.8.2-3)
.
Q1
TLES_UL_2
25-250_S1
_UPS BR1-2
-3_01US-a
Q1
I ON
0 OF
F
1
2
EP
O
EP
O
-
+
36
BR1
(3x20x1mm / L=220mm)
36
37
BR2
(3x20x1mm / L=220mm)
37
38
BR3
(3x20x1mm / L=220mm)
38
BR1
BR3
BR1, BR2 and BR3
MUST BE REMOVED
BR2
Содержание FGC TLE Series
Страница 1: ...TLE SERIES UPS 40 150 KVA KW 480 VAC Three phase Highly Efficient and Scalable GE Industrial Solutions...
Страница 14: ...14 LP33 Series II UPS www gecriticalpower com Notes...
Страница 15: ...15 LP33 Series II UPS www gecriticalpower com Notes...
Страница 333: ...TLE Series UPS 225 1500 kW for best in class multi mode operating efficiency...