Critical Power
Modifications reserved
Page 20/69
GE_UPS_ISG_TLE_SUL_M62_1M0_2US_V010.docx
Installation Guide
TLE Series 625 - 750 - 1000 UL S2
Fig. 4.4.1-8 TLE Series 1000 – UPS cabinet floor fixing points
Fig. 4.4.1-9 TLE Series 625 - 750 - 1000 – RPA Parallel System disposition
In case of
Parallel System
, try to place the UPS modules in sequence of their numbers
(marked on the packing).
If the units are positioned “
side by side
”, the side panels must be mounted on all
units.
Ø 0.53
" / 13
.5mm
FRONTAL SIDE
29
.5
3
" /
75
0
m
m
2.
37
"
/ 6
0
m
m
34
.0
6
" /
86
5
m
m
2.13 " / 54 mm
27.56 " / 700 mm
27.56 " / 700 mm
2.37 " / 60 mm
59.06 " / 1500 mm
143.50 " / 3645 mm
TLES_UL_1000_S1_UPS view top_01
12.80 "
325 mm
3.94 "/100 mm
3.94 "/100 mm
2.37 "/60 mm
UPS
3 - 4 - 5 - 6
TLES_UL_10
00_S1_RPA
disposition_
GE_01US
UPS 1
UPS 2
Содержание FGC TLE Series
Страница 1: ...TLE SERIES UPS 40 150 KVA KW 480 VAC Three phase Highly Efficient and Scalable GE Industrial Solutions...
Страница 14: ...14 LP33 Series II UPS www gecriticalpower com Notes...
Страница 15: ...15 LP33 Series II UPS www gecriticalpower com Notes...
Страница 333: ...TLE Series UPS 225 1500 kW for best in class multi mode operating efficiency...