Critical Power
Modifications reserved
Page 41/53
GE_UPS_ISG_TLE_SUL_40K_M15_1US_V010.docx
Installation Guide
TLE Scalable Series 40 - 150 UL S1
Fig. 4.9.2-2 Bus connection on first and last units
Final units, first and last, of a RPA Parallel System
On the two boards
P13/P14 – IM0022 – Bus Interface Board
, of the first and last units of a
Parallel
System
, the switches
SW1-1/2/3/4/5/6
MUST BE IN POSITION ON
(see
Fig. 4.9.2-2
).
Fig. 4.9.2-3 Bus connection on intermediate units
Intermediate units of a RPA Parallel System
On the two boards
P13/P14 – IM0022 – Bus Interface Board
, of the intermediate units of a
Parallel
System
, the switches
SW1-1/2/3/4/5/6
MUST BE IN POSITION OFF
(see
Fig. 4.9.2-3
).
1
2
3
SW1
4
5
6
ON
TL
ES
_03
0-
04
0_
S1
_R
PA
-IM
0222_
02
J2
J1
J2
J1
B
A
J1B/1
J1A/1
1
2
3
4
5
6
ON
SW1
J2
J1
B
J2
J1
A
J1B/1
J1B/2÷5
J1A/2÷5
J1A/1
TL
ES
_03
0-
04
0_
S1
_R
PA
-IM
0222_
03
Содержание FGC TLE Series
Страница 1: ...TLE SERIES UPS 40 150 KVA KW 480 VAC Three phase Highly Efficient and Scalable GE Industrial Solutions...
Страница 14: ...14 LP33 Series II UPS www gecriticalpower com Notes...
Страница 15: ...15 LP33 Series II UPS www gecriticalpower com Notes...
Страница 333: ...TLE Series UPS 225 1500 kW for best in class multi mode operating efficiency...