General System Requirements
1.3 Delivery Requirements
1.3.3 Conveyance of Crated System Components Within the Site
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
1-9
The center of gravity of each item, including lifting height and position, is marked on the
subsystem crate. When conveying the subsystems within the site, and particularly if there are
slopes in the delivery path, make sure to take the center of gravity into account.
Always lower system components at the slowest reasonable rate.
If the system components are to be transferred from an unloading site outside the building,
special facilities must be provided to ensure smooth conveyance.
Uneven temporary ramps may cause vibrations that could damage some components.
System components may be moved via flat-bed tow truck or by rolling them across
smooth
sidewalks or other paved surfaces.
When moving the gantry off a flat-bed tow truck, attach the straps to the lowest point possible
on the dolly.