Equipment Description and General Construction Requirements
2.4 Seismic Requirements
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
2-47
Table 2-5: Subsystem Centers of Gravity and Anchoring Points
IMPORTANT
For special seismic kit details and information, refer to the specific ITF released for the system seismic install.
Component
Center of Gravity Location
(cm)
Anchoring Method
See also
X
Y
Z
Patient table
109
30
50
Anchor plate + 6×HITLI-HLC 6.5×60/40
Figure 2-16,p.2-31Figure
2-21,p.2-38
NM gantry
0
*
19.1
*
102*
(+107.5
*)
4 × HILTI HSL-3-G M10/100 anchors
CT gantry on floor plates
109.5
7× HILTI HSL-3 M10/40 anchors
CT gantry in service position
*
*
110
None
NIO Console
23.8
30.6
10
None
UPS
None
†
CT PDU
35
23.5
49.5
None
NM acquisition station
None
Collimator carts
48.5
26.5
99
Carts cannot be anchored, as they must move
freely in the room for collimator exchange.
*
In the most unfavorable configuration
† http://powerquality.eaton.com/Products-services/Backup-Power-UPS/9155-info.asp