General System Requirements
1.3 Delivery Requirements
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
1-4
1.2.2 Project Coordination
The site project coordinator is the primary contact and liaison between GE Healthcare and all site-
related functions, including the purchaser, the construction planners, architects and contractors,
and other site administrative personnel.
To insure a successful installation, it recommended that the site nominates a single site project
coordinator, preferably a person familiar with similar medical construction projects, manages the
entire project. Ideally, the project coordinator is involved in every phase from pre-installation and
installation, from conceptual planning through to system start up, working closely with
GE Healthcare to ensure that the client upholds all requirements in this
Standard Integration
Instructions
.
1.3 Delivery Requirements
The system is packed for shipment with minimum tear-down of components.
CAUTION
!
The system components are sensitive to excessive mishandling, including dropping, shock, vibration, tipping
or hoisting. Vibration damage to components may not be evident until after system installation is complete.
The system components must
never
be dropped. A drop from a height greater than 1 cm (½") may
induce structural damage to the frame or other major components.
To avoid damage to sensitive components, dock-to-dock shipment is recommended. Other methods
are acceptable, provided the system is not dropped or otherwise mishandled.