Customer Checklist
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
A-5
Environmental
conditions
Ample working light is available for service
Air-conditioning meets requirements for system
thermal loads
Air-conditioning meets humidity requirements
Magnetic field in camera room is < 1 Gauss
Room is clean and free of dust, ready for installation
Room shielding
Shielding of scan room meets requirements
Shielding of operator room meets requirements
External exposure x-ray light installed
Safety
Planned location of emergency button in scan room
is easily accessible by operator
Interlock system installed
Table A-3: Room Preparation (Continued)
Description
Status See
Comments
Customer-Provided
Cabling and Connections
Door switch
Warning lights
System Emergency Off button (SEO)
Additional wiring from MDP to PDU and UPS
available