
7.8.4
Replace the UV monitor U9-M flow cell
Maintenance interval
Replace the UV flow cell when it is desired to use a flow cell with a different path length,
or if the cell is damaged. Clean the optical fiber connectors if they have accidentally
been touched.
Required material
The following materials are required:
For replacement of flow cell
•
UV flow cell
For cleaning of the optical fiber connectors
•
Lens paper
•
Isopropanol
Replace the flow cell
CAUTION
Hazardous chemicals or biological agents in UV flow cell. Make
sure that the entire flow cell has been flushed thoroughly with
bacteriostatic solution (e.g., NaOH) and distilled water, before service
and maintenance.
Follow the instruction to replace the UV flow cell.
Action
Step
Switch off the instrument.
1
Disconnect the tubing from the UV flow cell.
2
342
ÄKTA avant User Manual 29035184 AE
7 Maintenance
7.8 Replacement procedures
7.8.4 Replace the UV monitor U9-M flow cell
Содержание AKTA avant
Страница 1: ...ÄKTA avant User Manual ...
Страница 2: ...Page intentionally left blank ...
Страница 536: ...Page intentionally left blank ...
Страница 537: ...Page intentionally left blank ...