![Fukuda Denshi DS-8400 Скачать руководство пользователя страница 267](http://html.mh-extra.com/html/fukuda-denshi/ds-8400/ds-8400_service-manual_2344852267.webp)
11-9
Handling the Lithium-Ion Battery Pack (BTO-005)
This section describes the handling and storage of the BTO-005 Battery Pack. Refer also to the BTO-005 Operation
Manual.
Handling the Battery
For uninterrupted monitoring, charge the battery when the battery level is low.
When the battery operation time becomes short even after it is fully charged, the battery needs to be replaced.
The battery should be charged at room temperature (10ºC to 30ºC).
The lithium-ion battery can only be charged in the specified operational temperatures of the equipment. Refer
to the operation manual of the lithium-ion battery (BTO-005) for details.
When using the battery for the first time, or using after leaving it for a while, make sure to fully charge the
battery before use.
Storing
To take advantage of the characteristic of the battery pack, pay attention to the following when storing.
Storage Temperature and Humidity for the Battery
Store in an environment specified below without corrosive gas.
Storage Period
Storage Temperature
Storage Humidity
Within 30 days
-20ºC to 50ºC
20% to 85% (non-condensing)
Within 90 days
-20ºC to 40ºC
Within 1 year
-20ºC to 20ºC
Do not store in an environment outside the specified temperature range or excessive high humidity. This
may result in leakage caused by expansion/contraction inside the battery or rusting of the metal part.
Long-Term Storage
If the battery is left installed in the monitor without use for a long period of time, the capacity recovery after
storage may be degraded.
When storing the monitor for a long period, remove the battery from the monitor.
Gas Measurement Accuracy Check Procedure (MGU-800/MGU-810)
This section describes about the procedure of gas measurement accuracy check.
Perform the gas measurement accuracy check when the multigas unit is connected.
Warm up the multigas unit sufficiently before updating the checked date of gas
measurement accuracy.To acquire maximum measurement accuracy, 10 minutes of warm
up is required after the power is turned ON.
If the accuracy check is performed using a low pressure gas, the accuracy of gas
measurement will be reduced. Make sure to perform the accuracy check using the
specified calibration gas before its expiration date.
CAUTION
Содержание DS-8400
Страница 4: ......
Страница 36: ...xxxii ...
Страница 46: ...1 6 ...
Страница 74: ...3 4 ...
Страница 117: ...5 1 Wiring Diagram Chapter 5 Main Unit DSC 8400 5 2 ...
Страница 120: ...5 4 ...
Страница 128: ...6 8 ...
Страница 130: ...7 2 DSC 8410 CPU Unit BLK ...
Страница 132: ...7 4 DSC 8410 Power Supply Unit BLK ...
Страница 135: ...7 7 DSC 8410 Assembly 1 Front Case Part ...
Страница 137: ...7 9 DSC 8410 Assembly 2 CPU Unit Part ...
Страница 139: ...7 11 DSC 8410 Assembly 3 Joint Part Expansion Module Part ...
Страница 141: ...7 13 DSC 8410 Assembly 4 COM AUX Part Recorder Part ...
Страница 143: ...7 15 DSC 8410 Assembly 5 Power Board Part Power Supply Unit Part ...
Страница 145: ...7 17 DSC 8410 Assembly 6 Rear Case Sheet Metal Part Item number ...
Страница 147: ...7 19 DSC 8410 Assembly 7 Rear Case Part Item number Connector position ...
Страница 149: ...7 21 DSC 8410 Assembly 8 Front Rear Stand Part ...
Страница 152: ...7 24 DSC 8410 Assembly 10 Super Unit Cover Assembly ...
Страница 154: ...7 26 DSC 8410 Assembly 11 Super Unit Part Blank Cover Recorder Part Blank ...
Страница 156: ...7 28 DSC 8410 Assembly 12 Labeling ...
Страница 168: ...8 6 ...
Страница 222: ...9 54 ...
Страница 258: ...10 36 ...
Страница 272: ...11 14 ...
Страница 274: ...3 39 4 Hongo Bunkyo ku Tokyo Japan Tel 81 3 5684 1455 Fax 81 3 3814 1222 http www fukuda com 4R0101420 201706 ...