
Backup power and energy saving mode
Cabling variants including backup power circuits with 1-pin separation e.g. Austria or Australia
Transitioning from feeding energy into the grid to backup power mode
Transitioning from backup power mode to feeding energy into the grid
All-pin separation cabling variant, e.g. Germany, France, Spain, UK
Transitioning from feeding energy into the grid to backup power mode
Transitioning from backup power mode to feeding energy into the grid
All-pin split separation cabling variant (Italy)
Transitioning from feeding energy into the grid to backup power mode
Transitioning from backup power mode to feeding energy into the grid
Installation location and position
Choosing the location of the inverter
Choosing the location of third-party batteries
Explanation of symbols for the installation position
Install the mounting bracket and hang up the inverter
Properties of the mounting bracket
Do not deform the mounting bracket
Fitting the mounting bracket to a wall
Installing the mounting bracket on a mast or beam
Attaching the mounting bracket to mounting rails
Attaching the inverter to the mounting bracket
Prerequisites for connecting the inverter
Permitted cables for the data communication area
Maximum alternating current fuse protection
Connecting the inverter to the public grid (AC side)
Connecting the inverter to the public grid (AC side)
Connecting solar module strings to the inverter
General comments regarding solar modules
PV generator - general information
Multiple MPP tracker configuration 3-6 kW
Connecting the solar module strings to the inverter
Connecting the battery to the inverter
Connecting the battery on the DC side
Connecting backup power - PV Point (OP)
Connecting backup power - Full Backup
Cabling variants including backup power circuits with 1-pin separation e.g. Austria or Australia
All-pin separation cabling variant e.g. Germany, France, Spain
All-pin separation cabling variant, e.g. UK
All-pin separation cabling variant, e.g. Italy
Connecting the data communication cable
Routing data communication cables
4
Содержание Primo GEN24 3.0 Plus
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Backup power variant Full Backup 35...
Страница 36: ...36...
Страница 43: ...Installation 43...
Страница 44: ...44...
Страница 50: ...Do not install the inverter on the ceiling 50...
Страница 84: ...84...
Страница 90: ...90...
Страница 91: ...Settings website of the inverter 91...
Страница 92: ...92...
Страница 110: ...I O power man agement settings 4 relays 110...
Страница 112: ...I O power man agement settings 3 relays 112...
Страница 114: ...I O power man agement settings 2 relays 114...
Страница 118: ...118...
Страница 119: ...Options 119...
Страница 120: ...120...
Страница 129: ...Appendix 129...
Страница 130: ...130...
Страница 143: ...Circuit diagrams 143...
Страница 144: ...144...
Страница 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Страница 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Страница 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Страница 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Страница 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Страница 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Страница 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Страница 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Страница 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Страница 155: ...Dimensions of the inverter 155...
Страница 156: ...156...
Страница 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Страница 158: ...158...
Страница 159: ...159 EN...