
In this example, no more than 3000 W may be fed into the grid at the grid feed-in
point. However, any loads that are located between the inverter and the grid feed-in
point can be supplied by additional power from the inverter. These loads are also com-
pensated as required.
Dynamic power
regulation with
several inverters
Example 1: Fronius SnapINverter ≤ Fronius Primo GEN24
Only one primary meter is required for the Fronius Primo GEN24 inverter.
The power values shown are an example. Inverter configurations with power values
other than those shown in the example are possible, taking into account the criteria for
this example.
IMPORTANT!
Zero feed-in is not possible when using 2 inverters.
Settings on the Fronius Primo GEN24 inverter website:
1
Configure the primary meter at the feed-in point in the "Device configuration" →
"Components" menu area.
2
Activate the limit for the entire system in the "Safety and grid regulations" → "Export
limitation" menu area. Enter the DC nominal output of the entire PV system in the
"Total DC system power" input field. Enter the percentage value (50%, 60% or 70%)
in the "Maximum permitted feed-in power of the entire system" input field.
Example 2a: Fronius SnapINverter > Fronius Primo GEN24
Two primary meters are required for the inverters.
The power values shown are an example. Inverter configurations with power values
other than those shown in the example are possible, taking into account the criteria for
this example.
IMPORTANT!
With two primary meters at the feed-in point without a secondary meter, Fronius SnapIN-
verter and Fronius Primo GEN24 inverters cannot be displayed as a combined PV sys-
tem in Solar.web. Two individual PV systems must be created in Solar.web.
106
Содержание Primo GEN24 3.0 Plus
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Backup power variant Full Backup 35...
Страница 36: ...36...
Страница 43: ...Installation 43...
Страница 44: ...44...
Страница 50: ...Do not install the inverter on the ceiling 50...
Страница 84: ...84...
Страница 90: ...90...
Страница 91: ...Settings website of the inverter 91...
Страница 92: ...92...
Страница 110: ...I O power man agement settings 4 relays 110...
Страница 112: ...I O power man agement settings 3 relays 112...
Страница 114: ...I O power man agement settings 2 relays 114...
Страница 118: ...118...
Страница 119: ...Options 119...
Страница 120: ...120...
Страница 129: ...Appendix 129...
Страница 130: ...130...
Страница 143: ...Circuit diagrams 143...
Страница 144: ...144...
Страница 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Страница 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Страница 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Страница 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Страница 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Страница 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Страница 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Страница 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Страница 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Страница 155: ...Dimensions of the inverter 155...
Страница 156: ...156...
Страница 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Страница 158: ...158...
Страница 159: ...159 EN...