General
PV Point (OP)
With the PV Point, in the event of a failure
of the public grid, electrical devices can be
connected to the Opportunity Power (OP)
terminal and supplied with a maximum
power of 3 kW, if enough power is avail-
able from the solar modules or an optional
battery. In grid-connected operation, the
OP terminal is not supplied with voltage,
therefore the connected loads will not be
supplied with power in this operating
mode.
IMPORTANT!
A relay-based network switching setup is
not possible.
Explanation - PV
Point (OP)
The inverter can provide 120 to 240 V at the PV Point. A corresponding configuration
must be set up during commissioning.
At 120 to 240 V output voltage, a maximum of 13 A AC continuous current is available.
For example:
120 V = max. 1.5 kW
230 V = max. 3 kW
In backup power mode, some electrical appliances cannot function properly as starting
currents are too high (for example, fridges and freezers). It is recommended to switch off
non-essential loads during backup power mode. Overload capacity of 35% is possible for
a duration of 5 seconds, depending on the capacity of the solar modules and/or the bat-
tery at that moment in time.
There is a brief interruption when switching from grid-connected mode to backup power
mode. For this reason, the backup power function cannot be used as an uninterruptible
power supply, for example for computers.
If no energy from the battery or the solar modules is available in backup power mode,
backup power mode ends automatically. If sufficient energy becomes available from the
solar modules once again, backup power mode starts again automatically.
In the event of excessive consumption, backup power mode is stopped and the "backup
power overload" status code is displayed on the inverter's LED status indicator. The max-
imum power in backup power mode according to the technical data must be observed.
33
EN
Содержание Primo GEN24 3.0 Plus
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Backup power variant Full Backup 35...
Страница 36: ...36...
Страница 43: ...Installation 43...
Страница 44: ...44...
Страница 50: ...Do not install the inverter on the ceiling 50...
Страница 84: ...84...
Страница 90: ...90...
Страница 91: ...Settings website of the inverter 91...
Страница 92: ...92...
Страница 110: ...I O power man agement settings 4 relays 110...
Страница 112: ...I O power man agement settings 3 relays 112...
Страница 114: ...I O power man agement settings 2 relays 114...
Страница 118: ...118...
Страница 119: ...Options 119...
Страница 120: ...120...
Страница 129: ...Appendix 129...
Страница 130: ...130...
Страница 143: ...Circuit diagrams 143...
Страница 144: ...144...
Страница 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Страница 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Страница 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Страница 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Страница 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Страница 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Страница 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Страница 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Страница 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Страница 155: ...Dimensions of the inverter 155...
Страница 156: ...156...
Страница 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Страница 158: ...158...
Страница 159: ...159 EN...