
can be set here. Devices having higher priority are actuated first, and subsequently, if
there is still excess energy available, the other devices.
Load management
It is possible for up to four different load management rules to be defined. At the same
threshold values, the rules are activated in succession. For deactivation, this is done in
reverse; the I/O last switched on is the first to be switched off. In the case of different
thresholds, the I/O with the lowest threshold is switched on first, followed by the second
lowest, and so on.
I/Os controlled by the produced power are always prioritised over a battery and Ohmpi-
lot. That is to say that an I/O can switch on and result in the battery no longer being
charged or the Ohmpilot no longer being activated.
An I/O is activated or deactivated only after 60 seconds.
Control
-
Control is deactivated.
-
Control is effected by the power generated.
-
Control is effected by excess power (given feed limits). This option can only be
selected if a meter has been connected. Control via Energy Manager is effected
using the actual power of feeding in with respect to the grid.
Thresholds
-
On: For entering an effective power limit, at which the output is activated.
-
Off: For entering an effective power limit, at which the output is deactivated.
Runtimes
-
Field for enabling a minimum duration for which the output is to be activated for each
switch-on process.
-
Field for enabling the maximum runtime per day.
-
Field for enabling a target duration for which the output is to be activated in total per
day (total of several switch-on processes).
98
Содержание Primo GEN24 3.0 Plus
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Backup power variant Full Backup 35...
Страница 36: ...36...
Страница 43: ...Installation 43...
Страница 44: ...44...
Страница 50: ...Do not install the inverter on the ceiling 50...
Страница 84: ...84...
Страница 90: ...90...
Страница 91: ...Settings website of the inverter 91...
Страница 92: ...92...
Страница 110: ...I O power man agement settings 4 relays 110...
Страница 112: ...I O power man agement settings 3 relays 112...
Страница 114: ...I O power man agement settings 2 relays 114...
Страница 118: ...118...
Страница 119: ...Options 119...
Страница 120: ...120...
Страница 129: ...Appendix 129...
Страница 130: ...130...
Страница 143: ...Circuit diagrams 143...
Страница 144: ...144...
Страница 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Страница 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Страница 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Страница 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Страница 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Страница 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Страница 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Страница 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Страница 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Страница 155: ...Dimensions of the inverter 155...
Страница 156: ...156...
Страница 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Страница 158: ...158...
Страница 159: ...159 EN...