
(1)
Solar module – inverter – load/grid
(2)
Solar module – inverter – battery*
(3)
Battery – inverter – load/grid*
(4)
Grid – inverter – battery*
* depending on the settings and local standards and regulations.
Operating states
(only for systems
with a battery)
Battery systems distinguish different operating states. In this case, the relevant current
operating state is displayed on the website of the inverter or in Solar.web.
Operating state
Description
Normal operation
Energy is stored or drawn, as required.
Min. state of charge (SOC)
achieved
Battery has reached the minimum SOC set or specified
by the manufacturer. The battery cannot be discharged
any further.
Energy saving mode
(standby)
The system has been put into energy saving mode.
Energy saving mode is automatically ended as soon as
sufficient excess energy is available again.
Start
The storage system starts from energy saving mode
(standby).
Forced re-charging
The inverter re-charges the battery, in order to maintain
the set minimum SOC (state of charge) or the SOC
specified by the manufacturer (protection against deep
discharge).
Deactivated
The battery is not active. It has either been deactiv-
ated/switched off, or an error means that no commu-
nication with the battery is possible.
20
Содержание Primo GEN24 3.0 Plus
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Backup power variant Full Backup 35...
Страница 36: ...36...
Страница 43: ...Installation 43...
Страница 44: ...44...
Страница 50: ...Do not install the inverter on the ceiling 50...
Страница 84: ...84...
Страница 90: ...90...
Страница 91: ...Settings website of the inverter 91...
Страница 92: ...92...
Страница 110: ...I O power man agement settings 4 relays 110...
Страница 112: ...I O power man agement settings 3 relays 112...
Страница 114: ...I O power man agement settings 2 relays 114...
Страница 118: ...118...
Страница 119: ...Options 119...
Страница 120: ...120...
Страница 129: ...Appendix 129...
Страница 130: ...130...
Страница 143: ...Circuit diagrams 143...
Страница 144: ...144...
Страница 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Страница 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Страница 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Страница 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Страница 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Страница 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Страница 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Страница 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Страница 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Страница 155: ...Dimensions of the inverter 155...
Страница 156: ...156...
Страница 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Страница 158: ...158...
Страница 159: ...159 EN...