
Modbus 0 (MB0) switch
Switches the terminating resistor for
Modbus 0 (MB0) on/off.
Position 1:
Terminating resistor on
(factory setting)
Position 0:
Terminating resistor off
Modbus 1 (MB1) switch
Switches the terminating resistor for
Modbus 1 (MB1) on/off.
Position 1:
Terminating resistor on
(factory setting)
Position 0:
Terminating resistor off
Optical sensor
To operate the inverter. See chapter
Button functions and LED status
indicator
on page
Communication LED
Indicates the inverter connection status.
Operating status LED
Indicates the inverter operating status.
LAN 1
Ethernet connection for data communic-
ation (e.g. WLAN router, home network
or for commissioning with a laptop, see
chapter
on page
LAN 2
Ethernet connection only for data com-
munication from inverter to inverter (cur-
rently unavailable).
WSD terminal
Push-in terminal for the WSD installa-
tion. See chapter
on page
.
USB
Power supply max. 1 A at 5 V. Software
updates and data recording via USB is
not possible.
IOs terminal
Push-in terminal for digital inputs/
outputs. See chapter
for the data communication area
page
.
The designations (RG0, CL0, 1/5, 2/6,
3/7, 4/8) on the terminal refer to the
Demand Response Mode function, see
chapter
on page
Internal schem-
atic connection
diagram of the
IOs
On the V+/GND pin, it is possible to feed in a voltage of around 12.5 - 24 V (+ max. 20%)
with an external power supply. The outputs IO 0 - 5 can then be operated with the
external voltage. A maximum of 1 A can be drawn per output, with a maximum of 3 A
allowed in total. The fuse protection must be located externally.
29
EN
Содержание Primo GEN24 3.0 Plus
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Backup power variant Full Backup 35...
Страница 36: ...36...
Страница 43: ...Installation 43...
Страница 44: ...44...
Страница 50: ...Do not install the inverter on the ceiling 50...
Страница 84: ...84...
Страница 90: ...90...
Страница 91: ...Settings website of the inverter 91...
Страница 92: ...92...
Страница 110: ...I O power man agement settings 4 relays 110...
Страница 112: ...I O power man agement settings 3 relays 112...
Страница 114: ...I O power man agement settings 2 relays 114...
Страница 118: ...118...
Страница 119: ...Options 119...
Страница 120: ...120...
Страница 129: ...Appendix 129...
Страница 130: ...130...
Страница 143: ...Circuit diagrams 143...
Страница 144: ...144...
Страница 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Страница 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Страница 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Страница 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Страница 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Страница 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Страница 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Страница 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Страница 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Страница 155: ...Dimensions of the inverter 155...
Страница 156: ...156...
Страница 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Страница 158: ...158...
Страница 159: ...159 EN...