
Connecting solar module strings to the inverter
General com-
ments regarding
solar modules
To enable suitable solar modules to be chosen and to use the inverter as efficiently as
possible, it is important to bear the following points in mind:
-
If insolation is constant and the temperature is falling, the open circuit voltage of the
solar modules will increase. The open circuit voltage must not exceed the maximum
permissible system voltage. If the open circuit voltage exceeds the specified values,
the inverter will be destroyed and no warranty claims will be entertained.
-
The temperature coefficients on the data sheet of the solar modules must be
observed.
-
Exact values for sizing the solar modules can be obtained using suitable calculation
tools, such as the
.
IMPORTANT!
Before connecting up the solar modules, check that the voltage for the solar modules
specified by the manufacturer corresponds to the actual measured voltage.
IMPORTANT!
The solar modules connected to the
inverter must comply with the IEC 61730
Class A standard.
IMPORTANT!
Solar module strings must not be earthed.
Safety
WARNING!
Incorrect operation or poorly executed work can cause serious injury or damage.
Commissioning as well as maintenance and service work in the power module of the
inverter must only be carried out by service personnel trained by Fronius and only within
the scope of the respective technical regulations. Read the Installation and Operating
Instructions before installing and commissioning the equipment.
WARNING!
An electric shock can be fatal.
Danger due to grid voltage and DC voltage from solar modules that are exposed to light.
▶
Ensure that the AC and DC side of the inverter are de-energised before carrying out
any connection/maintenance or service tasks.
▶
Only an authorised electrical engineer is permitted to connect this equipment to the
public grid.
61
EN
Содержание Primo GEN24 3.0 Plus
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Backup power variant Full Backup 35...
Страница 36: ...36...
Страница 43: ...Installation 43...
Страница 44: ...44...
Страница 50: ...Do not install the inverter on the ceiling 50...
Страница 84: ...84...
Страница 90: ...90...
Страница 91: ...Settings website of the inverter 91...
Страница 92: ...92...
Страница 110: ...I O power man agement settings 4 relays 110...
Страница 112: ...I O power man agement settings 3 relays 112...
Страница 114: ...I O power man agement settings 2 relays 114...
Страница 118: ...118...
Страница 119: ...Options 119...
Страница 120: ...120...
Страница 129: ...Appendix 129...
Страница 130: ...130...
Страница 143: ...Circuit diagrams 143...
Страница 144: ...144...
Страница 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Страница 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Страница 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Страница 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Страница 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Страница 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Страница 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Страница 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Страница 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Страница 155: ...Dimensions of the inverter 155...
Страница 156: ...156...
Страница 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Страница 158: ...158...
Страница 159: ...159 EN...