Connecting backup power - PV Point (OP)
Safety
IMPORTANT!
The valid national laws, standards and provisions, as well as the specifications of the rel-
evant grid operator are to be taken into account and applied.
It is highly recommended that the specific installation be agreed with the grid operator
and explicitly approved by this operator. This obligation applies to system constructors in
particular (e.g. installers).
NOTE!
The continuous supply via the PV Point depends on the available PV power.
If the solar modules are not supplying enough power, interruptions may occur.
▶
Do not connect any loads that require an interruption-free supply.
WARNING!
Danger from incorrect installation, commissioning, operation or incorrect use.
This can result in severe personal injury/damage to property.
▶
Only trained and qualified personnel are authorised to install and commission the
system, and only within the scope of the technical regulations.
▶
The Installation and Operating Instructions must be read carefully prior to use.
▶
If anything is unclear, contact your vendor immediately.
WARNING!
Danger due to damaged and/or contaminated terminals.
This can result in serious injury and damage to property.
▶
Before making any connections, check the terminals for damage and contamination.
▶
Remove contamination in the de-energized state.
▶
Have defective terminals repaired by an authorised specialist.
Installation
NOTE!
All loads that have to be supplied via the OP terminal must be protected by means
of a residual current circuit breaker.
In order to ensure the residual current circuit breaker operates properly, a connection
must be established between the neutral conductor N' (OP) and the earth.
For the Circuit Diagram recommended by Fronius, see
Circuit Diagram - PV Point (OP)
on page
70
Содержание Primo GEN24 3.0 Plus
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Backup power variant Full Backup 35...
Страница 36: ...36...
Страница 43: ...Installation 43...
Страница 44: ...44...
Страница 50: ...Do not install the inverter on the ceiling 50...
Страница 84: ...84...
Страница 90: ...90...
Страница 91: ...Settings website of the inverter 91...
Страница 92: ...92...
Страница 110: ...I O power man agement settings 4 relays 110...
Страница 112: ...I O power man agement settings 3 relays 112...
Страница 114: ...I O power man agement settings 2 relays 114...
Страница 118: ...118...
Страница 119: ...Options 119...
Страница 120: ...120...
Страница 129: ...Appendix 129...
Страница 130: ...130...
Страница 143: ...Circuit diagrams 143...
Страница 144: ...144...
Страница 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Страница 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Страница 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Страница 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Страница 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Страница 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Страница 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Страница 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Страница 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Страница 155: ...Dimensions of the inverter 155...
Страница 156: ...156...
Страница 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Страница 158: ...158...
Страница 159: ...159 EN...