![Froling TX 150 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/froling/tx-150/tx-150_installation-instructions-manual_2338744037.webp)
❒ Screw the previously removed shaft circlip onto the shaft
❒ Push the entire unit in and screw it with 4 hexagonal bolts M8x20 and lining disks
M8 at the flange of the fire box
4.5.14 Installing the switch cabinet and cable ducts
Depending on the design two different sizes of switch cabinets are available (600x600
mm / 600x1200 mm) (24x24 inch / 24x48 inch). The following illustrations show the
bigger switch cabinet (TX200-250 standard delivery contents, TX 150 optional).
❒ Mount the switch cabinet at the heat exchanger front on the insulating side panel
by using the included studs (flat headed screws included to the switch cabinet)
❒ Open the switch cabinet door and fix the switch cabinet at each corner on the in‐
sulating side panel
Assembly
4
Mounting steps
Installation Instructions TX 150-250 | M1320112_en
37