![Froling TX 150 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/froling/tx-150/tx-150_installation-instructions-manual_2338744002.webp)
Contents
Qualification of assembly staff
Protective equipment for assembly staff
General standards for heating systems
Standards for structural and safety devices
Installation and approval of the heating system
General information for installation room (boiler room)
Requirements for central heating water
Chimney connection/chimney system
Boiler data for planning the flue gas system
Moving the boiler in the boiler room
Minimum distances in the boiler room
Screwing the fire box with the heat exchanger
Installing sensor of thermal discharge system
Preparation of flue gas recirculation connection (Option)
Retrofitting the WOS bar (if necessary)
Installing lower main frame of insulation
Installing upper main frame of insulation
Installing the frame for the insulating door
Installing the insulating side panels
Complete the heat exchanger cover and the combustion chamber door
Check grate settings and install the tipping grate motor
Installing the fire box ash removal unit
Installing the switch cabinet and cable ducts
Installing the automatic igniter
Contents
2
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froling.com