![Froling TX 150 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/froling/tx-150/tx-150_installation-instructions-manual_2338744023.webp)
4.5.7 Installing lower main frame of insulation
NOTICE
Separate parts of the boiler are fitted with a protective film. This MUST be re‐
moved before assemby!
❒ Insert each bottom insulation below fire box and heat exchanger
❒ Place longitudinal and cross elements of the bottom main frame of the insulation
on the floor
❒ Fix longitudinal elements at intended positions on the front and the back of the
boiler
Assembly
4
Mounting steps
Installation Instructions TX 150-250 | M1320112_en
23