![Froling TX 150 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/froling/tx-150/tx-150_installation-instructions-manual_2338744015.webp)
4 Assembly
4.1 Transport
NOTICE
Damage to components if handled incorrectly
❒ Follow the transport instructions on the packaging
❒ Transport components with care to avoid damage
❒ Protect the packaging against damp
❒ Operate unloading, positioning and mounting only by trained professionals!
Staff has to be familiar with the handling and moving of heavy loads! (tools
and lifting tools , lashing points, etc.)
4.2 Positioning
❒ Attach a cable winch or similar lifting device to the eyelets on the boiler
4.3 Temporary storage
If the system is to be assembled at a later stage:
❒ Store components at a protected location, which is dry and free from dust
➥ Damp and frost can damage components, particularly electric ones!
4.4 Set-up in the boiler room
4.4.1 Moving the boiler in the boiler room
❒ Position a fork-lift or similar lifting device with a suitable load-bearing capacity at
the base frame
❒ Lift and transport to the intended position in the installation room
➥ Observe the minimum distances in the boiler room.
Assembly
4
Transport
Installation Instructions TX 150-250 | M1320112_en
15